Factory preparation can be efficient, but site readiness controls whether installation starts smoothly. Confirm conditions before dispatching materials and crews.
Access and unloading
Check road width, turning space, overhead obstructions, bridge limits, unloading area and whether a crane or manual handling is required.
Foundation and levels
Verify dimensions, diagonals, anchor locations, top levels, curing, drainage and access around the foundation.
Temporary facilities
Provide safe power, water, material storage, worker access, waste handling and weather protection where required.
Coordination and approvals
Confirm drawings, responsibilities, delivery sequence, site contact, working hours and safety arrangements before mobilization.