Preliminary quantity take-off
Build, price, print and export a material list
Select a construction system, enter dimensions and receive an editable preliminary BOQ for early budgeting and supplier inquiry preparation.
V15 A4 document-grade quantity take-off
Build a complete BOQ in a structured table
Enter project information, edit every material row, add custom work items, save a draft, and generate print, Excel and PDF documents.
| Project and document information | |||
|---|---|---|---|
| Geometry and commercial settings | |||
Editable schedule
Material and work-item table
Change descriptions, specifications, units, quantities and rates. Removed default rows can be restored with Reset rows.

Prefab House Nepal Pvt. Ltd.Prefab • Modular • Building SolutionsPAN/VAT: 603507373
BOQ & Material ScheduleSunakothi, Satdobato–Tikabhairab Road, Lalitpur 44700, Nepal+977 9851187267 · prefabhousenepal@gmail.comPHN-BOQ-20260809 · R0
ProjectProject material take-off
ClientTo be confirmed
LocationTo be confirmed
SystemPrefab room or cabin
Dimensions8 × 5 × 3 m
Date / validity09/08/202615 days
| No. | Code / section | Material or work item | Specification | Unit | Qty. | Rate | Amount | Action |
|---|---|---|---|---|---|---|---|---|
| 1 | NPR 289,710 | |||||||
| 2 | NPR 275,940 | |||||||
| 3 | NPR 177,473.5 | |||||||
| 4 | NPR 120,960 | |||||||
| 5 | NPR 125,000 | |||||||
| 6 | NPR 57,200 | |||||||
| 7 | NPR 180,000 | |||||||
| 8 | NPR 180,000 |
Section cost summary
| Envelope | NPR 453,413.5 |
| Structure | NPR 289,710 |
| Services | NPR 180,000 |
| Installation | NPR 180,000 |
| Openings | NPR 125,000 |
| Floor | NPR 120,960 |
| Accessories | NPR 57,200 |
Notes and exclusions
Final procurement quantities require approved design and site measurement.
SubtotalNPR 1,406,283.5
Tax (13%)NPR 182,816.86
Estimated totalNPR 1,589,100.36
Prepared byPrefab House Nepal Project DeskSignature / date
Checked by________________________Technical review