Master Plan Design and Drawing

Ref. No:

 

 

 

Master Plan Design and Drawing

 

 

Project Summary
SN. Particular Amount Result/ Deliverables
1 Site Survey  with Surveyor & Assistant team  with logistics of team  (Site Field Visit & Inspection) Surveyed Map (1:100 Scale)
2 Detailed Concept Planning of Building Block with Placement , Design and Development of Concept in Drawing (2D Autocad) for Real Construction Work by Concept Planner  Expert team ( Construction Team , Engineer, Architect) Master Plan Drawing  with Beautiful Project placing all blocks in right position and land suitable design and structures with Engineering Safety  and Space utilize focused
3 Detailed layout and plan of Septic Tank , Soak Pit ,Drain management   Drain and Water Filter Placement Layout, Plumbing, Soak Pit  Layout Map
4 Master Plan Drawing & Design of Building block two story floor with plinth area 925 sq. ft.   Master Plan Including all Blocks in  A1 Size Paper
5 Architectural Drawing of 3 Bedrooms, Kitchen Dinning ,4 toilets bathroom   Arch. Drawing with Elevation , top ,plan view  in  (A-2 Size)
6 Structural Column Plan , Layout , Truss Details , of Building Blocks   structural column plan , truss details ,section x-x of Each Block in (A-2 Size), Working Drawing of Building Blocks in A-2
7 Foundation Footing Details & Working Drawing of Building Blocks   Footing Details and Working Drawing of Building in (A-2 ) Size Paper
8 Exterior Model of Building, Landscaping model & Exterior Visualization and Walk through of Complete project   During meeting discussion suggested not required.
9 Bill of Quantity Preparation   For Building Blocks   BOQ with Cost For Construction &Material Specification of Structure, Roofing, Wall, Door/Window in details
10 Electrical & Lighting Placement Drawing Light, Power Socket Drawing in A-2 Size

 

 

 

Rs 80,000/-

COST ESTIMATE FOR Quality Assurance

 

COST ESTIMATE FOR Quality Assurance
HIRING CONSULTING FIRMS TO CONDUCT FOR Quality Monitoring & Technical Reporting’s During Construction Work and Verifying Work Execution of Prefab Hostel Building with other Necessary Block Project.
S.N Description Person Unit Hr. Rate Total Remark
A Salary of Personnel
2 Architectural Engineer with Construction Supervision 1 14 7500 105,000.00
3 Civil Engineer with Supervision 1 5 5500 27,500.00 .
4 Technical /Structure Engineer Supervision 1 4 16500 66,000.00
Tank, Soak pit, Plumbing, Landscape Supervision 1 5 3500 17,500.00
5 Interior Design, Furniture, Kitchen Designer, Hall Design Consultant 1 5 21500 107500.00
6 , Electrical Engineer, Sanitary & Waste Manage Expert 1 5 21500 107500.00  
A Sub Total 431,000.00
B Miscellaneous expenses
Communication cost 7000.00
Drafting/ reports 20000.00
Equipment’s, vehicles, computers, Software, Analysis 20000.00
Sub Total 47000.00
Grand Total 478000.00
VAT @13% of G 62140.00
Total (G+H) 540,140.00

 

 

 

 

 

 

 

Building design process

Content

  1. Site Survey- Map, Photo, Trace map, Google Map
  2. The Concept Plan of the overall project by design team
  3. Establishing the need & Requirements with eco-friendly focus.
  4. Feasibility Study & Site Survey for the Given Requirement of Building
  5. Selection of designers, Structural Engineers as per the job schedules,
  6. Drawing and Detailing of Concept design & Planner in AutoCAD and other Software
  7. Detailed design –Architectural, Structural Drawing
  8. Production information of Landscape, Ground, Boundary, Building, Draining, Water, Plumbing Works for Construction on-site.
  9. Building Model & Structural Design & development with Walk Through
  10. Bill of Quantity & Material Specification –
  11. Final Cost Estimate Preparation for Construction of Project as per drawing & Design.
  12. BID Documents Preparation (If Required)
  13. Conclusion; Find out more & Better Improve

Building’s Construction process

Note: Final Costing and BOQ will be after Preparation of Detailed Project Report (Master Plan, Architectural Drawing , Structural Drawing , Opening Schedules, Foundation Details )

1.       Make Booklet Copy with All detailed drawings, master plan, photos.

  1. Bid Documents and Get EOI -Comparison
  2. Select the Expert and Competitive Firm for Project Execution.
  3. Establishing the Scope of Work with the specified Cost for given Work.
  4. MoU between Clients and Contractors
  5. Start off Project Work with Civil Works,
  6. Followed by Foundation, Structure, Wall, Roofing, False Ceiling, Doors/Window Installation / Electrical and Plumbing Works.
  7. Quality Assurance by Expert on consulting the work on site specially focused on Architectural Design and Structural Works, Interior Designing, Electrical, Landscape Works.
  8. Painting and Finishing Work of Building
  9. Production of Futsal, Play Ground, Pavement, Drain – Soak pit, water tank management for Construction on-site.
  10. Building Model & Real Construction Comparison and verify and work out best to make everything smooth and fine.
  11. Project Summary Reporting and Handover –
  12. Find out more & Better Improve

 

 

Quality Assurance Process

1.       Site Visit and Verify the construction work as per all detailed drawings, master plan, model and photos.

  1. Prepare Report and Recommend Contractor for the Work Punch list.
  2. Measure, plan and guide for water tank, drain, electrical wiring works.
  3. Verifying the Scope of Work and make Clarity between Client and Contractor by the Report of Civil Engineer for given Work.
  4. MoU between Clients and Contractors
  5. Quality Assurance by Expert on consulting the work on site specially focused on Architectural Design and Structural Works, Interior Designing, Electrical, Landscape Works.
  6. Assure Building Safety, Usability and Functionality
  7. Guide Worker for Play Ground, Pavement, Drain – Soak pit, water tank management for Construction on-site by Engineer/ Team Leader.
  8. Building Model & Real Construction Comparison and verify and work out best to make everything smooth and fine.
  9. Project Summary Reporting and Handover –
  10. Find out more & Better Improve

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Abstract of Cost

Prefab House Nepal Pvt. Ltd.

Khumaltar-15 G.P.O. Box. No. 13534-Kathmandu email:info@prefabhousenepal.com, (T)+977 -1-5571213 , 9851187267

Project: Estimate cost of Hostel Building  and Prefab Building Block at  Dhading , Nepal
Type of work: Construction of Prefab Building Block for Hostel with
Complete works including  Boundary wall
Date: January 14 2020
S.n Description of work L, m W,m H,m

Area (Sqm. /cum.)

Total Price

Deliverables
I Construction of Prefab 6 Bedrooms for 35 Girls Each 20 Sqm.) 1 15.700 7.65 2.75 120 4200071.85 6 Rooms with Door/Window, Light Non-Furnished )
II Construction of Prefab Dinning Hall 1 6 3.25 2.75 20 891735 Hall Room Unfurnished
III Construction of Prefab Kitchen Hall 1 6 3.25 2.75 20 723879 Kitchen with modular Cabinets & Counter Top
IV Construction of Prefab Hall for Reading /TV/ 1 10 4.00 2.75 40 1398800 Hall Room with Unfurnished
V Construction of Prefab Meeting Hall 1 8 3.25 2.75 26 965172 Meeting Hall Unfurnished
VI Construction of Prefab Warden Family House 1 12 4.00 2.75 48 1781856 Family House with Non Furnished
VII Construction of Prefab Common toilet/bathrooms 1 8 3.25 2.75 26 1077076 Toilets with Commode, Tiles, Shower, tap
VIII Construction of Soak pit  for Waste and Drain manage 4 2 2.00 1.5

24

cu.m

925000
IX Construction of Water Tank 1 4 2.00 2 12 cu.m 1680000

 

Sub-total (A)

NPR       13,643,589.85
1.2 Installation of Green Solar Plant for Energy Source 2 KW 1 3.00 4.00 NPR            725,300.00 2 Kw solar and 5 lights & System
1.3 Futsal Playground of Size 40 feet x70 fet 1 40.00 10.00 NPR            925,320.00 Futsal Playground
1.4 Compound Work with Metal Pipe & CGI Fencing ( For 2 Ropani Land 1 190 m NPR         1,533,300.00 Metal Fencing with CGI Sheet Cover
1.5 Installation of Water Filter System 1

 

NPR            455,500.00

Water Filter of 200 liter.
1.6 Installation of Pavement in Ground for 2 Ropani Land (Assumed) 1 100 Sqm NPR         1,150,000.00 Hexagon Pavement in Ground
1.7 Installation of Water Heating Solar for Hot Water Supply 200 l NPR            325,000.00 200l water heating
1.8

Installation of Solar System for Cooking

3 KW( Instead of Bio-Gas)

1 NPR         1,125,000.00 Solar System for Cooking
1.9

 

Sub-total(B)

NPR         6,239,420.00
Total(A+B) NPR     19,883,009.00
VAT 13% NPR         2,584,791.28
Scope of Work Grand Total NPR       22,467,801.13
1 Structure Metal  , Prefab  Wall , Doors/Window , Roofing  False Ceiling ,Painting with turn-key solution
2 25-30 % Advance during MOU
3
Submitted by:

 

Checked by:

Approved by:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project Timeline

Address: Dhading
Project :
Starting Date: March First Week
Completion Date:
Project Duration: 5 Months
S.N Works Duration (weeks) Time Period (Week)
3-Mar 25-Mar

5

Apr.

2

May

20

May

2-Jun 25-Jun 2-July

3-

Aug

1 30% Design and Layout 3
2 Site Visit and Custom Fabrication of structure for Project 4
Material for structure and core part delivery 2
3 Structural Metal Frame Installation 3
4 45% Roof  ,Flooring and Covering 2
5 Gutter and Flooring PCC 1
6 Ceiling 2
7 Wall Panel installation 3
8 25% Wall Framing  Window and Door 2
9 Ground Pavement & Boundary 3
10 Electrification 2
11 Coloring 2
Total Duration : Approx. 5 months including Building Works, Boundary Wall , Ground Pavement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Materials Specification for Prefab

VERTICAL STRUCTURE MEMBERS
GROUNG FLOOR                                                                   Provide 8″x8″ primer coated  C-Channel Coupled (box channel) as ISMC 150 column in ground floor11′ height connected to anchored nut bolt with foundation concrete base forming joint structure as per design & instruction of the Architect.
FIRST FLOOR & PLINTH                                                     Provide 8″x8″ primer coated C-Channel Coupled (box channel) as column in first floor10′ height connected to truss at top and column from ground floor extended with foundation base forming joint structure as per design & instruction of the Architect.
SECOND FLOOR                                                                     Provide 8″x8″ primer coated C-Channel Coupled (box channel) as column in first floor10′ height connected to truss at top and column from ground floor extended with foundation base forming joint structure as per design & instruction of the Architect.
HORIZONTAL STRUCTURE MEMBERS ( Beams & Frame) & Joist for First Floor and Half Second Floor
Provide and install decking frame with I-beam channel of ISMB 8″ forming in I and II & a portion of III floors to complete structure of building for flooring that can withstand  live load of 200 kg/sq. m. as per design & instruction of the Architect.
CONCRETE BASE WITH TRENCHING – GROUND FLOOR
Provide and lay Cement+ Concrete +Sand 1:2:4 (5’x5’x5’ ground excavation, digging and 5’x5’x5’ post foundation with 16 mm,12 mm road and Foundation anchored rod welded to footing rod to connect column all complete as per design.
FLOORING WORKS
BRICK SOLING                                                                                          Provide & lay one layer (110mm) brick soling with approved local chimney made first class brick in line and level including filling in the joints with sand all complete as per drawing, specification and instruction of Architect.
PCC WORKS                                                                            Provide PCC flooring with Cement, sand & aggregate of approved quality in 1:3:6 ratio including mixing, finishing, laying with proper compaction in perfect line, level & dimensions, curing all complete.
DECKING WORKS ( I, II Floor)
Provide and install in position Composite Metal Deck with Concrete PCC  Flooring board for base flooring, in approved sample including filling gaps, etc.  All complete as per the drawing and  instruction of the Architect.
WALL PARTITION / PANNELLING WORKS
Prefab 75mm  PARTITION WALL – INTERNAL AREA
Provide and install in position full height VISAKA CEMENT board partition 3″ thick in G.I. metal frame, 8mm thick gypsum board on both side with glass wool in between, including all other hardware,  expansion bolt, metal jambs where required, cutting opening for switch boards, etc. of approved sample including sealant, etc. All complete as per the drawing and  instruction of the Architect.
Prefab Panel 75mm  BOARD PARTITION WALL – TOILET AREA
Provide and install in position full height cement board partition 3″ thick in G.I. metal frame, 8mm thick cement board on both side with glass wool in between, including all other hardware,  expansion bolt, metal jambs where required, cutting opening for switch boards, etc. of approved sample including sealant, etc. All complete as per the drawing and  instruction of the Architect.
GLASS PARTITION WITH ALUMINIUM FRAME
Provide and install in position full height partition in approves aluminium section with 12mmclear toughened 12mm glass door beside & below fix with 12mm thick clear toughened glass and frosted sticker   in approved aluminium frame, including all hardware, rubber gasket and sealant, etc. all complete as per the drawing and  instruction of the Architect.
CEMENT & PUFF PANEL PARTITION WALL -EXTERNAL AREA
Provide and install in position full height cement board partition 4″ thick in G.I. metal frame, 18mm thick Brick & Stone finish puff panel on outer face and 8mm thich cement board on inner side with glass wool in between, including all other hardware,  expansion bolt, metal jambs where required, cutting opening for switch boards, etc. of approved sample including sealant, etc. All complete as per the drawing and  instruction of the Architect.
Plain Cement Board on the Back Side of Building
BRICK FINISH PUFF PANEL( Front, Left  & Right Side View)
STONE FINISH PUFF PANEL ( Left Side View)
METAL WORKS
STAIRCASE LANDING WITH METAL BASE                                                                                        Provide and install staircase with I- Beam supporting structure with metal angle and 18mm thick cement plank on landing all complete with material, installation, finishing and two coats of primer as per approved design in each floor as per the drawings.
MS RAILING
3″x3″ horizontal rails placed @6″ c/c
4″x4″ VERTICAL POSTS placed @5′-1″ c/c
ROOF TRUSS AND PURLINS
MS WORKS FOR ROOF TRUSS & PURLINS                                                                                                      Fabricate and install roof truss and perlins in MS black steel suqare or round section including welding, fixing, erection with all necessary hardware MS bed plates, shoes angles anchor bolts including two coat of primer painting all complete as per design and instruction of Architect.
ROOFING SHEET                                                                            Supply and lay colour coated 3mm UPVC sheets, weight 6.0kg/m2 of approved sample including overlapping, fixing/fasteners, GI-Hooks, sealing washers all complete as per specification and instruction of Architect.
DOORS & WINDOWS
UPVC DOOR  UPVC frame door + UPVC cladding with hinges, lock, and fixing as per drawings all complete.
ALUMINIUM FRAMED GLASS WINDOWS                                                                                             Aluminium alloy frame with glass: Double glazed window with fixing, hooks and installation as per drawings.  Aluminium alloy frame 90 mm series complete material supply, slider, lock and installation.
FALSE CEILING WORKS
GYPSUM BOARD CEILING
Provide and install 12 mm thick Gypsum Board (imported of the approved type) false ceiling, with G.I. Frame work of approved section, including all accessories, G.I. Hanging system with fiber tape on joints, cutting out of openings for all lights fixtures, linear grills and diffusers, G.I angle support on ends where ever required, all complete as per drawing.
ACOUSTIC FALSE CEILING ( HALL)
Provide and install 12 mm thick Accoustic false ceiling (imported of the approved type), with G.I. Frame work of approved section, including all accessories, G.I. Hanging system with fiber tape on joints, cutting out of openings for all lights fixtures, linear grills and diffusers, G.I angle support on ends where ever required, all complete as per drawing.
PAINT WORK
POP WORKS                                                                                                              Provide and apply plaster of paris (POP) with Birla, Nerolac or equivalent quality Putty in approved texture with minimum two coats to internal plastered surfaces to make it smooth, filling the depression with putty and making it ready to receive paint, complete in all respect.
PLASTIC EMULSION
Provide and apply plastic emulsion paint (Nerolac Impression. Dulux. Asian or equivalent)  of approved color and texture with minimum three coats of approved shade over a coat of primer to internal surfaces prepared smooth with carborandum, filling the depression with putty etc. complete in all respect.
ENAMEL PAINT
Provide and apply satin finish enamel paint (Nerolac Impression. Dulux. Asian or equivalent) of approved color with minimum three coats of approved shade over a coat of metal primer to the purlins, columns, beams and other surfaces as per design and  instruction of the Architect.
ELECTRICAL FITTINGS                                                       Complete with conduiting, wiring, installation of switching and power socket & termination in each floor 7W led lights 7 no.s and 7 power socket in each floor
SANITATION ( Plumbing , Tiling & Fixture Works)
SUPERVISION

 